Tonga

10.4 - Single window

Articles 10.4.110.4.210.4.310.4.4
View measure text
Indicative date of implementation 22 February 2022
Definitive date of implementation 31 December 2029
Deadline for extension request, if required 2 September 2029
Assistance required for implementation Support to for a feasibility study to investigate viability of a Single Window system and based on results further support to implement - if viable.

Tags: Diagnostic and Needs Assessment

Donor / Agency

Australia, New Zealand

Progress reported
16 June 2022 — G/TFA/N/TON/4  
Tonga has yet to implement and set up a single window system, this will be considered upon when the ASYCUDA World is fully stood up and operational. ASYCUDA World is funded through the Governments of Australia and New Zealand and technical assistance from UNCTAD through the PACER Plus Agreement.

TACB support is still required from Donors for the following:
1. Implement one-stop-shop clearance Customs, MAFFF, and Port Authority (2021) - as per Art 8
2. Undertake a Single Window Visioning Worksop with public and private sector (2023)
3. Undertake a Single Window Feasibility Study (to be reviewed as a result of the visioning workshop) (2024)
4. Prepare a Single Window Blueprint (to be reviewed as a result of the Single Window Feasibility Study) (2026)