Vanuatu
Articles |
7.6.1
–
7.6.2
View measure text |
---|---|
Indicative date of implementation | 31 December 2020 |
Definitive date of implementation | 31 December 2023 |
Assistance required for implementation |
Procedures: Publication of average release time is yet to be implemented. Need assistance to implement the controls and procedures to meet the FTA requirements to regularly measure the publish average release times. Human Resource Training: Needs more assistance on training and capacity building ICT/Equipment: Further assistance on ICT to link the system to the time release for regular monitoring. |
Donor / Agency |
World Bank, World Customs Organization World Bank Group (WBG) in partnership with the Private Participation in Infrastructure (PPIU) |
Progress reported |
25 February 2025 — G/TFA/N/VUT/4The Import TRS 2023 report was finalized and launched in 2024.The World Bank Group provided training and support to the members of the Trade Facilitation Steering Committee (TFSC) Working Group to utilize the WCO Time Release Study Tool and to identify key 'testing points' in the clearance for preparation of a TRS survey. The TRS Working Group developed an initial survey and conducted the TRS. Areas of assistance required: • It is anticipated that at the completion of the TRS analysis that Vanuatu will require assistance in the next few years and aims to be self-sufficient for future TRS by 2026. |