Congo

Detailed notification breakdown

Show measures by their implementation dates:

Implementation Date
Article Type Indicative Definitive Additional Information
1.1 b 30 October 2021 30 October 2024
     1.1.1 b 30 October 2021 30 October 2024
           1.1.1 (a) b 30 October 2021 30 October 2024
           1.1.1 (b) b 30 October 2021 30 October 2024
           1.1.1 (c) b 30 October 2021 30 October 2024
           1.1.1 (d) b 30 October 2021 30 October 2024
           1.1.1 (e) b 30 October 2021 30 October 2024
           1.1.1 (f) b 30 October 2021 30 October 2024
           1.1.1 (g) b 30 October 2021 30 October 2024
           1.1.1 (h) b 30 October 2021 30 October 2024
           1.1.1 (i) b 30 October 2021 30 October 2024
           1.1.1 (j) b 30 October 2021 30 October 2024
Implementation Date
Article Type Indicative Definitive Additional Information
1.2
     1.2.1 c 30 September 2021 30 September 2025
TA Requirments
           1.2.1 (a) c 30 September 2021 30 September 2025
TA Requirments
           1.2.1 (b) c 30 September 2021 30 September 2025
TA Requirments
           1.2.1 (c) c 30 September 2021 30 September 2025
TA Requirments
     1.2.2 c 30 September 2021 30 September 2025
TA Requirments
     1.2.3 c 30 September 2021 30 September 2025
TA Requirments
Implementation Date
Article Type Indicative Definitive Additional Information
1.3 b 30 July 2020 30 July 2022
     1.3.1 b 30 July 2020 30 July 2022
     1.3.2 b 30 July 2020 30 July 2022
     1.3.3 b 30 July 2020 30 July 2022
     1.3.4 b 30 July 2020 30 July 2022
Implementation Date
Article Type Indicative Definitive Additional Information
1.4 b 30 July 2020 30 July 2022
     1.4 (a) b 30 July 2020 30 July 2022
     1.4 (b) b 30 July 2020 30 July 2022
     1.4 (c) b 30 July 2020 30 July 2022
Implementation Date
Article Type Indicative Definitive Additional Information
2.1 b 30 November 2021 30 November 2024
     2.1.1 b 30 November 2021 30 November 2024
     2.1.2 b 30 November 2021 30 November 2024
     2.1.3 b 30 November 2021 30 November 2024
Implementation Date
Article Type Indicative Definitive Additional Information
2.2 c 30 November 2020 30 November 2025
TA Requirments
Implementation Date
Article Type Indicative Definitive Additional Information
3 a 22 February 2017
     3.1 a 22 February 2017
     3.2 a 22 February 2017
           3.2 (a) a 22 February 2017
           3.2 (b) a 22 February 2017
     3.3 a 22 February 2017
     3.4 a 22 February 2017
     3.5 a 22 February 2017
     3.6 a 22 February 2017
           3.6 (a) a 22 February 2017
           3.6 (b) a 22 February 2017
           3.6 (c) a 22 February 2017
     3.7 a 22 February 2017
     3.8 a 22 February 2017
     3.9 a 22 February 2017
           3.9 (a) a 22 February 2017
                 3.9 (a) (i) a 22 February 2017
                 3.9 (a) (ii) a 22 February 2017
           3.9 (b) a 22 February 2017
                 3.9 (b) (i) a 22 February 2017
                 3.9 (b) (ii) a 22 February 2017
                 3.9 (b) (iii) a 22 February 2017
                 3.9 (b) (iv) a 22 February 2017
           3.9 (c) a 22 February 2017
           3.9 (d) a 22 February 2017
Implementation Date
Article Type Indicative Definitive Additional Information
4 a 22 February 2017
     4.1 a 22 February 2017
           4.1 (a) a 22 February 2017
           4.1 (b) a 22 February 2017
     4.2 a 22 February 2017
     4.3 a 22 February 2017
     4.4 a 22 February 2017
           4.4 (a) a 22 February 2017
           4.4 (b) a 22 February 2017
           4.4 end paragraph a 22 February 2017
     4.5 a 22 February 2017
     4.6 a 22 February 2017
Implementation Date
Article Type Indicative Definitive Additional Information
5.1 a 22 February 2017
     5.1 (a) a 22 February 2017
     5.1 (b) a 22 February 2017
     5.1 (c) a 22 February 2017
     5.1 (d) a 22 February 2017
Implementation Date
Article Type Indicative Definitive Additional Information
5.2 a 22 February 2017
Implementation Date
Article Type Indicative Definitive Additional Information
5.3 a 22 February 2017
     5.3.1 a 22 February 2017
     5.3.2 a 22 February 2017
     5.3.3 a 22 February 2017
Implementation Date
Article Type Indicative Definitive Additional Information
6.1 b 30 September 2020 30 September 2024
     6.1.1 b 30 September 2020 30 September 2024
     6.1.2 b 30 September 2020 30 September 2024
     6.1.3 b 30 September 2020 30 September 2024
     6.1.4 b 30 September 2020 30 September 2024
Implementation Date
Article Type Indicative Definitive Additional Information
6.2
     6.2 (i) c 30 November 2020 30 November 2025
TA Requirments
     6.2 (ii) c 30 November 2020 30 November 2025
TA Requirments
Implementation Date
Article Type Indicative Definitive Additional Information
6.3 b 30 July 2020 30 July 2024
     6.3.1 b 30 July 2020 30 July 2024
     6.3.2 b 30 July 2020 30 July 2024
     6.3.3 b 30 July 2020 30 July 2024
     6.3.4 b 30 July 2020 30 July 2024
           6.3.4 (a) b 30 July 2020 30 July 2024
           6.3.4 (b) b 30 July 2020 30 July 2024
     6.3.5 b 30 July 2020 30 July 2024
     6.3.6 b 30 July 2020 30 July 2024
     6.3.7 b 30 July 2020 30 July 2024
Implementation Date
Article Type Indicative Definitive Additional Information
7.1 b 30 September 2021 30 September 2024
     7.1.1 b 30 September 2021 30 September 2024
     7.1.2 b 30 September 2021 30 September 2024
Implementation Date
Article Type Indicative Definitive Additional Information
7.2 c 31 December 2022 31 December 2025
TA Requirments
Implementation Date
Article Type Indicative Definitive Additional Information
7.3
     7.3.1 c 30 November 2020 30 December 2025
TA Requirments
     7.3.2 c 30 November 2020 30 December 2025
TA Requirments
           7.3.2 (a) c 30 November 2020 30 December 2025
TA Requirments
           7.3.2 (b) c 30 November 2020 30 December 2025
TA Requirments
     7.3.3 c 30 November 2020 30 December 2025
TA Requirments
     7.3.4 c 30 November 2020 30 December 2025
TA Requirments
     7.3.5 c 30 November 2020 30 December 2025
TA Requirments
     7.3.6 c 30 November 2020 30 December 2025
TA Requirments
Implementation Date
Article Type Indicative Definitive Additional Information
7.4
     7.4.1 c 30 September 2020 30 September 2025
TA Requirments
     7.4.2 c 30 September 2020 30 September 2025
TA Requirments
     7.4.3 c 30 September 2020 30 September 2025
TA Requirments
     7.4.4 c 30 September 2020 30 September 2025
TA Requirments
Implementation Date
Article Type Indicative Definitive Additional Information
7.5 b 30 June 2020 30 June 2024
     7.5.1 b 30 June 2020 30 June 2024
     7.5.2 b 30 June 2020 30 June 2024
     7.5.3 b 30 June 2020 30 June 2024
     7.5.4 b 30 June 2020 30 June 2024
Implementation Date
Article Type Indicative Definitive Additional Information
7.6
     7.6.1 c 31 October 2021 30 October 2025
TA Requirments
     7.6.2 c 31 October 2021 30 October 2025
TA Requirments
Implementation Date
Article Type Indicative Definitive Additional Information
7.7 b 12 October 2017 12 October 2017
     7.7.1 b 12 October 2017 12 October 2017
     7.7.2 b 12 October 2017 12 October 2017
           7.7.2 (a) b 12 October 2017 12 October 2017
                 7.7.2 (a) (i) b 12 October 2017 12 October 2017
                 7.7.2 (a) (ii) b 12 October 2017 12 October 2017
                 7.7.2 (a) (iii) b 12 October 2017 12 October 2017
                 7.7.2 (a) (iv) b 12 October 2017 12 October 2017
           7.7.2 (b) b 12 October 2017 12 October 2017
                 7.7.2 (b) (i) b 12 October 2017 12 October 2017
                 7.7.2 (b) (ii) b 12 October 2017 12 October 2017
     7.7.3 b 12 October 2017 12 October 2017
           7.7.3 (a) b 12 October 2017 12 October 2017
           7.7.3 (b) b 12 October 2017 12 October 2017
           7.7.3 (c) b 12 October 2017 12 October 2017
           7.7.3 (d) b 12 October 2017 12 October 2017
           7.7.3 (e) b 12 October 2017 12 October 2017
           7.7.3 (f) b 12 October 2017 12 October 2017
           7.7.3 (g) b 12 October 2017 12 October 2017
     7.7.4 b 12 October 2017 12 October 2017
     7.7.5 b 12 October 2017 12 October 2017
     7.7.6 b 12 October 2017 12 October 2017
Implementation Date
Article Type Indicative Definitive Additional Information
7.8
     7.8.1 c 30 September 2020 30 September 2025
TA Requirments
           7.8.1 (a) c 30 September 2020 30 September 2025
TA Requirments
           7.8.1 (b) c 30 September 2020 30 September 2025
TA Requirments
           7.8.1 (c) c 30 September 2020 30 September 2025
TA Requirments
           7.8.1 (d) c 30 September 2020 30 September 2025
TA Requirments
           7.8.1 (e) c 30 September 2020 30 September 2025
TA Requirments
           7.8.1 (f) c 30 September 2020 30 September 2025
TA Requirments
           7.8.1 (g) c 30 September 2020 30 September 2025
TA Requirments
           7.8.1 (h) c 30 September 2020 30 September 2025
TA Requirments
     7.8.2 c 30 September 2020 30 September 2025
TA Requirments
           7.8.2 (a) c 30 September 2020 30 September 2025
TA Requirments
           7.8.2 (b) c 30 September 2020 30 September 2025
TA Requirments
           7.8.2 (c) c 30 September 2020 30 September 2025
TA Requirments
           7.8.2 (d) c 30 September 2020 30 September 2025
TA Requirments
     7.8.3 c 30 September 2020 30 September 2025
TA Requirments
Implementation Date
Article Type Indicative Definitive Additional Information
7.9 a 22 February 2017
     7.9.1 a 22 February 2017
           7.9.1 (a) a 22 February 2017
           7.9.1 (b) a 22 February 2017
     7.9.2 a 22 February 2017
     7.9.3 a 22 February 2017
     7.9.4 a 22 February 2017
Implementation Date
Article Type Indicative Definitive Additional Information
8 c 31 December 2020 31 December 2025
TA Requirments
     8.1 c 31 December 2020 31 December 2025
TA Requirments
     8.2 c 31 December 2020 31 December 2025
TA Requirments
           8.2 (a) c 31 December 2020 31 December 2025
TA Requirments
           8.2 (b) c 31 December 2020 31 December 2025
TA Requirments
           8.2 (c) c 31 December 2020 31 December 2025
TA Requirments
           8.2 (d) c 31 December 2020 31 December 2025
TA Requirments
           8.2 (e) c 31 December 2020 31 December 2025
TA Requirments
Implementation Date
Article Type Indicative Definitive Additional Information
9 b 30 November 2020 30 November 2022
Implementation Date
Article Type Indicative Definitive Additional Information
10.1
     10.1.1 c 30 October 2021 30 October 2025
TA Requirments
           10.1.1 (a) c 30 October 2021 30 October 2025
TA Requirments
           10.1.1 (b) c 30 October 2021 30 October 2025
TA Requirments
           10.1.1 (c) c 30 October 2021 30 October 2025
TA Requirments
           10.1.1 (d) c 30 October 2021 30 October 2025
TA Requirments
Implementation Date
Article Type Indicative Definitive Additional Information
10.2 b 30 September 2020 30 September 2023
     10.2.1 b 30 September 2020 30 September 2023
     10.2.2 b 30 September 2020 30 September 2023
     10.2.3 b 30 September 2020 30 September 2023
Implementation Date
Article Type Indicative Definitive Additional Information
10.3 b 30 September 2020 30 September 2023
     10.3.1 b 30 September 2020 30 September 2023
     10.3.2 b 30 September 2020 30 September 2023
Implementation Date
Article Type Indicative Definitive Additional Information
10.4
     10.4.1 c 30 September 2021 30 September 2025
TA Requirments
     10.4.2 c 30 September 2021 30 September 2025
TA Requirments
     10.4.3 c 30 September 2021 30 September 2025
TA Requirments
     10.4.4 c 30 September 2021 30 September 2025
TA Requirments
Implementation Date
Article Type Indicative Definitive Additional Information
10.5
     10.5.1 c 31 December 2021 31 December 2025
TA Requirments
     10.5.2 c 31 December 2021 31 December 2025
TA Requirments
Implementation Date
Article Type Indicative Definitive Additional Information
10.6 a 22 February 2017
     10.6.1 a 22 February 2017
     10.6.2 a 22 February 2017
     10.6.3 a 22 February 2017
Implementation Date
Article Type Indicative Definitive Additional Information
10.7 a 22 February 2017
     10.7.1 a 22 February 2017
     10.7.2 a 22 February 2017
           10.7.2 (a) a 22 February 2017
           10.7.2 (b) a 22 February 2017
           10.7.2 (c) a 22 February 2017
           10.7.2 (d) a 22 February 2017
           10.7.2 (e) a 22 February 2017
Implementation Date
Article Type Indicative Definitive Additional Information
10.8 b 31 August 2020 31 August 2024
     10.8.1 b 31 August 2020 31 August 2024
     10.8.2 b 31 August 2020 31 August 2024
Implementation Date
Article Type Indicative Definitive Additional Information
10.9 a 22 February 2017
     10.9.1 a 22 February 2017
     10.9.2 a 22 February 2017
           10.9.2 (a) a 22 February 2017
           10.9.2 (b) a 22 February 2017
           10.9.2 (c) a 22 February 2017
Implementation Date
Article Type Indicative Definitive Additional Information
11
     11.1 c 30 December 2020 30 December 2024
TA Requirments
           11.1 (a) c 30 December 2020 30 December 2024
TA Requirments
           11.1 (b) c 30 December 2020 30 December 2024
TA Requirments
     11.2 c 30 December 2020 30 December 2024
TA Requirments
     11.3 c 30 December 2020 30 December 2024
TA Requirments
     11.4 b 30 December 2020 30 December 2024
     11.5 c 30 December 2020 30 December 2026
TA Requirments
     11.6
           11.6 (a) c 30 December 2020 30 December 2026
TA Requirments
           11.6 (b) c 30 December 2020 30 December 2026
TA Requirments
     11.7 c 30 December 2020 30 December 2026
TA Requirments
     11.8 c 30 December 2020 30 December 2026
TA Requirments
     11.9 c 30 December 2020 30 December 2026
TA Requirments
     11.10 c 30 December 2020 30 December 2026
TA Requirments
     11.11 c 30 December 2020 30 December 2025
TA Requirments
     11.12 b 31 December 2020 31 December 2025
     11.13 b 31 December 2020 31 December 2025
     11.14 b 30 December 2020 30 December 2026
     11.15 b 31 December 2020 31 December 2025
     11.16 b 31 December 2020 31 December 2025
           11.16 (a) b 31 December 2020 31 December 2025
           11.16 (b) b 31 December 2020 31 December 2025
           11.16 (c) b 31 December 2020 31 December 2025
     11.17 b 31 December 2020 31 December 2025
Implementation Date
Article Type Indicative Definitive Additional Information
12 b 31 December 2020 31 December 2025
     12.1 b 31 December 2020 31 December 2025
           12.1.1 b 31 December 2020 31 December 2025
           12.1.2 b 31 December 2020 31 December 2025
     12.2 b 31 December 2020 31 December 2025
           12.2.1 b 31 December 2020 31 December 2025
           12.2.2 b 31 December 2020 31 December 2025
     12.3 b 31 December 2020 31 December 2025
     12.4 b 31 December 2020 31 December 2025
           12.4.1 b 31 December 2020 31 December 2025
                 12.4.1 (a) b 31 December 2020 31 December 2025
                 12.4.1 (b) b 31 December 2020 31 December 2025
                 12.4.1 (c) b 31 December 2020 31 December 2025
                 12.4.1 (d) b 31 December 2020 31 December 2025
                 12.4.1 (e) b 31 December 2020 31 December 2025
                 12.4.1 (f) b 31 December 2020 31 December 2025
           12.4.2 b 31 December 2020 31 December 2025
     12.5 b 31 December 2020 31 December 2025
           12.5.1 b 31 December 2020 31 December 2025
                 12.5.1 (a) b 31 December 2020 31 December 2025
                 12.5.1 (b) b 31 December 2020 31 December 2025
                 12.5.1 (c) b 31 December 2020 31 December 2025
                 12.5.1 (d) b 31 December 2020 31 December 2025
                 12.5.1 (e) b 31 December 2020 31 December 2025
                 12.5.1 (f) b 31 December 2020 31 December 2025
           12.5.2 b 31 December 2020 31 December 2025
           12.5.3 b 31 December 2020 31 December 2025
     12.6 b 31 December 2020 31 December 2025
           12.6.1 b 31 December 2020 31 December 2025
                 12.6.1 (a) b 31 December 2020 31 December 2025
                 12.6.1 (b) b 31 December 2020 31 December 2025
                 12.6.1 (c) b 31 December 2020 31 December 2025
                 12.6.1 (d) b 31 December 2020 31 December 2025
                 12.6.1 (e) b 31 December 2020 31 December 2025
           12.6.2 b 31 December 2020 31 December 2025
     12.7 b 31 December 2020 31 December 2025
           12.7.1 b 31 December 2020 31 December 2025
                 12.7.1 (a) b 31 December 2020 31 December 2025
                 12.7.1 (b) b 31 December 2020 31 December 2025
                 12.7.1 (c) b 31 December 2020 31 December 2025
                 12.7.1 (d) b 31 December 2020 31 December 2025
                 12.7.1 (e) b 31 December 2020 31 December 2025
           12.7.2 b 31 December 2020 31 December 2025
     12.8 b 31 December 2020 31 December 2025
     12.9 b 31 December 2020 31 December 2025
           12.9.1 b 31 December 2020 31 December 2025
           12.9.2 b 31 December 2020 31 December 2025
     12.10 b 31 December 2020 31 December 2025
           12.10 (a) b 31 December 2020 31 December 2025
           12.10 (b) b 31 December 2020 31 December 2025
           12.10 (c) b 31 December 2020 31 December 2025
           12.10 (d) b 31 December 2020 31 December 2025
           12.10 (e) b 31 December 2020 31 December 2025
           12.10 (f) b 31 December 2020 31 December 2025
           12.10 (g) b 31 December 2020 31 December 2025
           12.10 (h) b 31 December 2020 31 December 2025
     12.11 b 31 December 2020 31 December 2025
           12.11.1 b 31 December 2020 31 December 2025
                 12.11.1 (a) b 31 December 2020 31 December 2025
                 12.11.1 (b) b 31 December 2020 31 December 2025
                 12.11.1 (c) b 31 December 2020 31 December 2025
           12.11.2 b 31 December 2020 31 December 2025
     12.12 b 31 December 2020 31 December 2025
           12.12.1 b 31 December 2020 31 December 2025
           12.12.2 b 31 December 2020 31 December 2025

Legend

A Fully notified in A
Ap Partially notified in A
N Not yet notified
B Fully notified in B
Bp Partially notified in B
CB Shift from C to B
E Extension of time requested
C Fully notified in C
Cp Partially notified in C
BC Shift from B to C
Arrangements & Progress

Notification Status