Guyana

8 - Border Agency Cooperation

Articles 8.2 (b)
View measure text
Indicative date of implementation 22 February 2020
Definitive date of implementation 22 February 2027
Deadline for extension request, if required 25 October 2026
Shift Shift from Cat. B to Cat. C notification.
Assistance required for implementation Technical Assistance is required:
• Enactment of the relevant procedures regulations to guide operations between bordering countries.

Tags: Infrastructure and equipment, Institutional procedures

Donor / Agency

To be determined

Progress reported
9 November 2020 — G/TFA/N/GUY/4  
Progress in the provision of technical assistance and capacity building support:
Article 8.2 (b –e) was given an extended timeline of 2027, since full implementation is not feasible in the short term and would require procedural and legal changes.
8.2 b – TACB support needs include:
• Enactment of relevant border procedures regulations to guide operations between bordering countries.
8.2 c – TACB support needs include:
• Drafting of legislation to allow for the acceptance of results of cross border testing and common standards.
• Training and development of testing facilities.
8.2 d – TACB support needs include:
• Development of IT system to capture all the required information and data at the borders.
8.2 e – TACB support needs include:
• Enactment of the relevant procedures regulations to guide operations.
• Increased institutional capacity, infrastructure, and equipment.
• Harmonisation of different systems between bordering countries.
• Training for staff of the various regulatory agencies at the border.
Articles 8.2 (c)
View measure text
Indicative date of implementation 22 February 2020
Definitive date of implementation 22 February 2027
Deadline for extension request, if required 25 October 2026
Shift Shift from Cat. B to Cat. C notification.
Assistance required for implementation Financial and Technical Assistance required:
• Drafting legislation to allow for the acceptance of results of cross border testing and common standards.
• Training and development of testing facilities.

Tags: Legislative and regulatory framework, Infrastructure and equipment, Human resources and training

Donor / Agency

To be determined

Progress reported
9 November 2020 — G/TFA/N/GUY/4  
Progress in the provision of technical assistance and capacity building support:
Article 8.2 (b –e) was given an extended timeline of 2027, since full implementation is not feasible in the short term and would require procedural and legal changes.
8.2 b – TACB support needs include:
• Enactment of relevant border procedures regulations to guide operations between bordering countries.
8.2 c – TACB support needs include:
• Drafting of legislation to allow for the acceptance of results of cross border testing and common standards.
• Training and development of testing facilities.
8.2 d – TACB support needs include:
• Development of IT system to capture all the required information and data at the borders.
8.2 e – TACB support needs include:
• Enactment of the relevant procedures regulations to guide operations.
• Increased institutional capacity, infrastructure, and equipment.
• Harmonisation of different systems between bordering countries.
• Training for staff of the various regulatory agencies at the border.
Articles 8.2 (d)
View measure text
Indicative date of implementation 22 February 2020
Definitive date of implementation 22 February 2027
Deadline for extension request, if required 25 October 2026
Shift Shift from Cat. B to Cat. C notification.
Assistance required for implementation Technical Assistance required:
• Develop IT system to capture all the required information and data at the borders.

Tags: Information and communication technologies (ICT)

Donor / Agency

To be determined

Progress reported
9 November 2020 — G/TFA/N/GUY/4  
Progress in the provision of technical assistance and capacity building support:
Article 8.2 (b –e) was given an extended timeline of 2027, since full implementation is not feasible in the short term and would require procedural and legal changes.
8.2 b – TACB support needs include:
• Enactment of relevant border procedures regulations to guide operations between bordering countries.
8.2 c – TACB support needs include:
• Drafting of legislation to allow for the acceptance of results of cross border testing and common standards.
• Training and development of testing facilities.
8.2 d – TACB support needs include:
• Development of IT system to capture all the required information and data at the borders.
8.2 e – TACB support needs include:
• Enactment of the relevant procedures regulations to guide operations.
• Increased institutional capacity, infrastructure, and equipment.
• Harmonisation of different systems between bordering countries.
• Training for staff of the various regulatory agencies at the border.
Articles 8.2 (e)
View measure text
Indicative date of implementation 22 February 2020
Definitive date of implementation 22 February 2027
Deadline for extension request, if required 25 October 2026
Shift Shift from Cat. B to Cat. C notification.
Assistance required for implementation Financial and Technical Assistance required:
• Enactment of the relevant procedures regulations to guide operations.
• Increased institutional capacity, infrastructure and equipment.
• Harmonisation of different systems between bordering countries.
• Training for staff of the various regulatory agencies at the border.

Tags: Legislative and regulatory framework, Infrastructure and equipment, Institutional procedures, Human resources and training

Donor / Agency

To be determined

Progress reported
9 November 2020 — G/TFA/N/GUY/4  
Progress in the provision of technical assistance and capacity building support:
Article 8.2 (b –e) was given an extended timeline of 2027, since full implementation is not feasible in the short term and would require procedural and legal changes.
8.2 b – TACB support needs include:
• Enactment of relevant border procedures regulations to guide operations between bordering countries.
8.2 c – TACB support needs include:
• Drafting of legislation to allow for the acceptance of results of cross border testing and common standards.
• Training and development of testing facilities.
8.2 d – TACB support needs include:
• Development of IT system to capture all the required information and data at the borders.
8.2 e – TACB support needs include:
• Enactment of the relevant procedures regulations to guide operations.
• Increased institutional capacity, infrastructure, and equipment.
• Harmonisation of different systems between bordering countries.
• Training for staff of the various regulatory agencies at the border.