Date indicative de mise en oeuvre | 31 décembre 2021 |
Date définitive de mise en oeuvre | 31 décembre 2025 |
Date limite pour un report des dates, si nécessaire | 2 septembre 2025 |
Demande de report des dates |
Request received
21 août 2023
Original definitive date
31 décembre 2023
New date requested
31 décembre 2025
Date approved
31 décembre 2025
Reason
Maldives Customs Service (MCS) conducted a pilot Time Release Study (TRS) in 2021 and the result of it is yet to be published.
During the pilot study, it was identified that, MCS has challenges in data assimilation and merging, which is sourced from multiple border agencies. Therefore, MCS needs time to standardize the Cargo Manifest Process in order to conduct TRS periodically and in a consistent manner.
MCS needs donor assistance and guidance of an expert to conduct advice on how to overcome the issues identified in the pilot study and conduct a comprehensive TRS with the MCS team, so that a system would be established to conduct such periodic Time Release Studies.
Maldives Customs Services (MCS) requests for an extension up to 31 December 2025 to implement this Article.
Committee approval:
Approuvé
Link to notification
|
Assistance requise pour la mise en oeuvre |
Assistance requise pour la conception, la planification et la réalisation d'études sur le temps moyen nécessaire à la mainlevée. Assistance requise pour développer les capacités du personnel, qui doit recevoir la formation nécessaire pour pouvoir améliorer le temps moyen nécessaire à la mainlevée. |
Donateur / Agence | Pas encore de notification |
Progrès rapporté | Pas encore de notification |