Tanzanie
Articles |
8.1
–
8.2 (a), (b), (c), (d), (e)
Texte de la mesure |
---|---|
Date indicative de mise en oeuvre | 22 février 2025 |
Date définitive de mise en oeuvre | 30 juin 2030 |
Date limite pour un report des dates, si nécessaire | 1 avril 2030 |
Assistance requise pour la mise en oeuvre |
There is a need for support to: • Establish shared facilities for the remaining border posts (Horohoro, Mtambaswala, Ileje, Kabwe, Kasesya, Kasumulu and Lunga lunga) as well as harmonizing procedures and formalities; • Create sustainability of existing OSBPs; strengthening the instructional Framework, Capacity building, maintenance and management of OSBPs Standards; • Support the soft infrastructure at Horohoro-Lungangunga, Sirari-Isebania; and Establish and operationalize one Stop Border Post Control with Mozambique (MTAMBASWALA-NENGOMANO) and with Malawi (‘Kasumulo-Songwe); Manyovu-Mugina; OSBP /Tanzania/Burundi and others with potential growth of trade. |
Donateur / Agence | Pas encore de notification |
Progrès rapporté | Pas encore de notification |