Belize
Articles |
8.2 (b), (c), (d), (e)
Texte de la mesure |
---|---|
Date indicative de mise en oeuvre | 22 février 2019 |
Date définitive de mise en oeuvre | 31 janvier 2030 |
Date limite pour un report des dates, si nécessaire | 3 octobre 2029 |
Demande de report des dates |
Request received
30 août 2019
Original definitive date
22 février 2019
New date requested
31 janvier 2030
Date approved
31 janvier 2030
Reason
Requires the following additional assistance and support not earlier anticipated:
1. Assistance to conduct feasibility study.
2. Technical assistance to learn best practices in countries that have introduced joint border controls and one-stop border post control.
3. Financial assistance for equipment and software.
4. Technical assistance for strengthening the human resources of border agencies.
5. Technical assistance and cooperation for training and awareness building.
Committee approval:
Approved
Link to notification
|
Transfert | Transfert de la catégorie B vers la catégorie C. |
Assistance requise pour la mise en oeuvre | |
Donateur / Agence |
À déterminer |
Progrès rapporté |
10 mars 2023 — G/TFA/N/BLZ/4No development partner has so far been identified in the following areas:1. Assistance to conduct feasibility study on the establishment of a one stop border post. The study should include an analysis for the alignment of procedures and formalities using best practices and international standards. 2. Technical assistance to learn best practices in countries that have introduced joint border controls and one-stop border post control. 3. Financial assistance for facility, equipment and software. 4. Technical assistance for strengthening of human resource management of border agencies. 5. Technical assistance and cooperation for training and awareness building. |