Technical Assistance projects
In this page you can search for technical assistance projects as submitted by Members through their notifications on donor arrangements and progress in the provision technical assistance and capacity building support (TACB).
Show filters Hide filters
To be determined
ADB - Asian Development Bank
ADM - Italian Customs Administration & Monopolies
AFRITAC - Regional Technical Assistance Center for Southern Africa
ALADI - Latin American Integration Association
AfDB - African Development Bank
Australia
Borderless Alliance - Borderless Alliance
CARICOM - Caribbean Community
CDB - Caribbean Development Bank
CILSS - Cross-border trade flow in agricultural products in West Africa
CLDP - Commercial Law Development Program
COMESA - Common Market for Eastern and Southern Africa
Canada
Canada-CARICOM EDI - Canada-CARICOM Expert Deployment Initiative
Commonwealth - Commonwealth Secretariat
DANIDA - Danish International Development Agency
EAC - East African Community
EBRD - European Bank for Reconstruction and Development
EIF - Enhanced Integrated Framework
European Union
FAO - Food and Agriculture Organization
GATF - Global Alliance for Trade Facilitation
GIZ - German International Development Agency
Germany
HELVETAS - HELVETAS Swiss Intercooperation
IAEA - International Atomic Energy Agency
ICRF - Investment Climate Reform Facility
IDB - Inter-American Development Bank
IFC - International Finance Corporation
IICA - Inter-American Institute for Cooperation on Agriculture
IMC - International Medical Corps
IMF - International Monetary Fund
IMPACT
ITC - International Trade Centre
JICA - Japan International Cooperation Agency
KOICA - Korea International Cooperation Agency
MEDAIR
New Zealand
OEA - Organization of American States
OECD - Organisation for Economic Cooperation and Development
OIRSA - International Regional Organisation for Plant and Animal Health
PHAMA Plus - PHAMA Plus
Red Cross - International Federation of Red Cross
SACU - Southern Africa Customs Union
SADC - Southern African Development Community
SADC TRF - Southern African Development Community - Trade related Facility
SECO - State Secretariat for Economic Affairs of Swtizerland
SIDA - Swedish International Development Cooperation Agency
SIECA - Secretariat for Central American Economic Integration
STDF - Standards and Trade Development Facility
Swisscontact - Swisscontact
TFAF - Trade Facilitation Agreement Facility
TFWA - Trade Facilitation Programme in West Africa
TMA - TradeMark Africa
UN-OHRLLS - United Nations Office of the High Representative for the LDCs, LLDCs and Small Island Developing States
UNCTAD - United Nations Conference on Trade and Development
UNDP - United Nations Development Programme
USAID - United States Agency for International Development
USDA - United States Department of Agriculture
USDOC - United States Department of Commerce
United Kingdom
United States
WAEMU - West African Economic and Monetary Union
WB - World Bank
WCO - World Customs Organization
WTO - World Trade Organization
Select option
Select option
Select option
Select option
Select option
Select option
Albania
| Implementation project | Donor / Agency | Definitive implementation dates | TA needs notified | Progress reported | |
|---|---|---|---|---|---|
| 10.4 - Single window | World Bank | 31 January 2024 | Yes | Yes | Details |
Angola
| Implementation project | Donor / Agency | Definitive implementation dates | TA needs notified | Progress reported | |
|---|---|---|---|---|---|
| 1.2 - Information available through internet | World Bank | 30 June 2028 | Yes | Yes | Details |
| 6.1 - General disciplines on fees and charges | World Bank | 30 June 2029 | Yes | Yes | Details |
| 7.4 - Risk management | UNCTAD | 30 June 2027 | Yes | Yes | Details |
| 10.4 - Single window | World Bank | 30 June 2029 | Yes | Yes | Details |
Bangladesh
| Implementation project | Donor / Agency | Definitive implementation dates | TA needs notified | Progress reported | |
|---|---|---|---|---|---|
| 1.3 - Enquiry points | World Bank, USAID | 30 June 2026 | Yes | Yes | Details |
| 7.1 - Pre-arrival processing | USAID | 30 June 2025 | Yes | Yes | Details |
| 7.4 - Risk management | World Bank, USAID | 30 June 2029 | Yes | Yes | Details |
| 7.5 - Post-clearance audit | USAID, ADB | 30 June 2026 | Yes | Yes | Details |
| 7.7 - Authorized operators | USAID, ADB | 30 June 2024 | Yes | Yes | Details |
| 7.8 - Expedited shipments | USAID | 30 June 2026 | Yes | Yes | Details |
| 8 - Border Agency Cooperation | World Bank, ADB | 30 June 2030 | Yes | Yes | Details |
| 10.4 - Single window | World Bank | 30 June 2030 | Yes | Yes | Details |
Belize
| Implementation project | Donor / Agency | Definitive implementation dates | TA needs notified | Progress reported | |
|---|---|---|---|---|---|
| 1.1 - Publication | CDB | 31 December 2023 | Yes | Yes | Details |
| 1.2 - Information available through internet | CDB | 31 December 2023 | Yes | Yes | Details |
| 1.3 - Enquiry points | CDB | 31 December 2024 | Yes | Yes | Details |
| 1.4 - Notification | CDB | 31 December 2023 | Yes | Yes | Details |
| 3 - Advance rulings | IMF | 31 December 2023 | Yes | Yes | Details |
| 5.1 - Notifications for enhanced controls or inspections | USDA, OIRSA | 31 December 2024 | Yes | Yes | Details |
| 7.2 - Electronic payment | CDB | 31 December 2026 | Yes | Yes | Details |
| 7.4 - Risk management | CDB, WCO, IMF | 31 December 2024 | Yes | Yes | Details |
| 7.5 - Post-clearance audit | IMF, WCO | 31 December 2024 | Yes | Yes | Details |
| 7.6 - Average release times | CDB | 31 December 2024 | Yes | Yes | Details |
| 10.3 - Use of international standards | European Union, CDB | 31 December 2023 | Yes | Yes | Details |
| 10.4 - Single window | CDB, IDB | 30 June 2028 | Yes | Yes | Details |
Burundi
| Implementation project | Donor / Agency | Definitive implementation dates | TA needs notified | Progress reported | |
|---|---|---|---|---|---|
| 1.1 - Publication | European Union, ITC, COMESA | 31 December 2026 | Yes | Yes | Details |
| 1.2 - Information available through internet | World Bank, UNCTAD, TMA | 31 December 2028 | Yes | Yes | Details |
| 1.3 - Enquiry points | UNCTAD, TMA | 31 December 2027 | Yes | Yes | Details |
| 5.3 - Test procedures | European Union, COMESA, World Bank | 31 December 2029 | Yes | Yes | Details |
| 7.1 - Pre-arrival processing | WCO, UNCTAD, TMA | 31 December 2027 | Yes | Yes | Details |
| 7.2 - Electronic payment | UNCTAD, COMESA | 31 December 2028 | Yes | Yes | Details |
| 7.4 - Risk management | European Union, COMESA, UNDP | 31 December 2029 | Yes | Yes | Details |
| 7.5 - Post-clearance audit | TMA | 31 December 2029 | Yes | Yes | Details |
| 7.6 - Average release times | WCO | 31 December 2027 | Yes | Yes | Details |
| 7.9 - Perishable goods | EIF, TMA | 31 December 2029 | Yes | Yes | Details |
| 8 - Border Agency Cooperation | TMA, UNCTAD | 31 December 2029 | Yes | Yes | Details |
| 10.4 - Single window | TMA, UNCTAD | 31 December 2029 | Yes | Yes | Details |
Cambodia
| Implementation project | Donor / Agency | Definitive implementation dates | TA needs notified | Progress reported | |
|---|---|---|---|---|---|
| 1.4 - Notification | European Union | 31 August 2023 | Yes | Yes | Details |
| 7.1 - Pre-arrival processing | European Union, Swisscontact, GATF | 27 October 2023 | Yes | Yes | Details |
| 7.7 - Authorized operators | European Union, JICA | 01 May 2023 | Yes | Yes | Details |
| 8 - Border Agency Cooperation | World Bank, ADB | 01 January 2025 | Yes | Yes | Details |
| 10.4 - Single window | European Union | 07 May 2024 | Yes | Yes | Details |
| 11 - Transit | ADB | 01 January 2025 | Yes | Yes | Details |
Cote d'Ivoire
| Implementation project | Donor / Agency | Definitive implementation dates | TA needs notified | Progress reported | |
|---|---|---|---|---|---|
| 1.1 - Publication | USAID | 01 January 2021 | Yes | Yes | Details |
| 1.3 - Enquiry points | USAID, World Bank, TFWA | 01 January 2021 | Yes | Yes | Details |
| 2.1 - Comments and information before entry into force | World Bank, Borderless Alliance | 01 January 2025 | Yes | Yes | Details |
| 3 - Advance rulings | Germany, GIZ | 01 January 2025 | Yes | Yes | Details |
| 6.1 - General disciplines on fees and charges | USAID | 30 June 2026 | Yes | Yes | Details |
| 6.2 - Specific disciplines on fees and charges | USAID | 01 January 2025 | Yes | Yes | Details |
| 7.2 - Electronic payment | World Bank, TFWA | 30 June 2027 | Yes | Yes | Details |
| 7.6 - Average release times | WCO | 30 June 2027 | Yes | Yes | Details |
| 7.7 - Authorized operators | USAID, World Bank | 30 June 2027 | Yes | Yes | Details |
| 8 - Border Agency Cooperation | USAID, TMA | 30 June 2027 | Yes | Yes | Details |
| 10.1 - Formalities | USAID | 30 June 2027 | Yes | Yes | Details |
| 10.4 - Single window | World Bank, TFWA | 30 June 2027 | Yes | Yes | Details |
| 12 - Customs cooperation | World Bank, TFWA | 30 June 2027 | Yes | Yes | Details |
Cuba
| Implementation project | Donor / Agency | Definitive implementation dates | TA needs notified | Progress reported | |
|---|---|---|---|---|---|
| 10.4 - Single window | European Union, UNCTAD | 22 February 2027 | Yes | Yes | Details |
Dominican Republic
| Implementation project | Donor / Agency | Definitive implementation dates | TA needs notified | Progress reported | |
|---|---|---|---|---|---|
| 5.3 - Test procedures | IDB, OIRSA, USDA | 31 December 2021 | Yes | Yes | Details |
| 7.4 - Risk management | USDA | 01 June 2023 | Yes | Yes | Details |
| 7.9 - Perishable goods | IDB, USDA | 01 June 2023 | Yes | Yes | Details |
| 8 - Border Agency Cooperation | USDA | 01 June 2023 | Yes | Yes | Details |
| 10.4 - Single window | USDA | 31 December 2021 | Yes | Yes | Details |
Ecuador
| Implementation project | Donor / Agency | Definitive implementation dates | TA needs notified | Progress reported | |
|---|---|---|---|---|---|
| 2.2 - Consultations | United Kingdom, Germany, UNCTAD, WCO | 15 July 2023 | Yes | Yes | Details |
| 5.3 - Test procedures | United Kingdom, Germany, UNCTAD, WCO | 15 July 2028 | Yes | Yes | Details |
| 7.4 - Risk management | United Kingdom, Germany, UNCTAD, WCO | 15 July 2023 | Yes | Yes | Details |
| 7.7 - Authorized operators | United Kingdom, Germany, UNCTAD, WTO | 15 July 2023 | Yes | Yes | Details |
| 8 - Border Agency Cooperation | United Kingdom, Germany, UNCTAD, WCO | 15 July 2028 | Yes | Yes | Details |
| 10.4 - Single window | Canada, Germany, USAID, GATF, UNCTAD, WCO | 15 July 2027 | Yes | Yes | Details |
Egypt
| Implementation project | Donor / Agency | Definitive implementation dates | TA needs notified | Progress reported | |
|---|---|---|---|---|---|
| 3 - Advance rulings | USAID, CLDP | 30 June 2027 | Yes | Yes | Details |
| 7.4 - Risk management | United Kingdom, European Union, World Bank, USDA, IFC, KOICA | 30 June 2027 | Yes | Yes | Details |
| 7.5 - Post-clearance audit | European Union | 31 December 2024 | Yes | Yes | Details |
| 7.6 - Average release times | United Kingdom, IFC, World Bank | 31 March 2023 | Yes | Yes | Details |
| 7.7 - Authorized operators | European Union | 30 September 2023 | Yes | Yes | Details |
| 7.8 - Expedited shipments | European Union, USDA | 30 June 2027 | Yes | Yes | Details |
| 7.9 - Perishable goods | USDA | 30 September 2023 | Yes | Yes | Details |
| 8 - Border Agency Cooperation | United Kingdom, UNCTAD | 31 December 2024 | Yes | Yes | Details |
| 11 - Transit | European Union | 30 June 2027 | Yes | Yes | Details |
| 12 - Customs cooperation | European Union | 31 December 2024 | Yes | Yes | Details |
El Salvador
| Implementation project | Donor / Agency | Definitive implementation dates | TA needs notified | Progress reported | |
|---|---|---|---|---|---|
| 7.7 - Authorized operators | United States | 23 December 2022 | Yes | Yes | Details |
| 8 - Border Agency Cooperation | European Union, United States, IDB | 22 December 2021 | Yes | Yes | Details |
| 10.2 - Acceptance of copies | IDB | 22 December 2021 | Yes | Yes | Details |
| 10.4 - Single window | United States | 23 December 2027 | Yes | Yes | Details |
| 10.5 - Preshipment inspection | United States | 22 December 2021 | Yes | Yes | Details |
| 11 - Transit | IDB | 23 December 2022 | Yes | Yes | Details |
| 12 - Customs cooperation | European Union, IDB, WCO | 23 December 2021 | Yes | Yes | Details |
Eswatini
| Implementation project | Donor / Agency | Definitive implementation dates | TA needs notified | Progress reported | |
|---|---|---|---|---|---|
| 1.1 - Publication | World Bank, IFC | 22 February 2022 | Yes | Yes | Details |
| 1.2 - Information available through internet | World Bank, IFC | 22 February 2022 | Yes | Yes | Details |
| 1.3 - Enquiry points | World Bank, IFC | 22 February 2022 | Yes | Yes | Details |
| 7.4 - Risk management | World Bank, IFC | 22 February 2022 | Yes | Yes | Details |
| 7.6 - Average release times | World Bank, IFC | 22 February 2022 | Yes | Yes | Details |
| 7.7 - Authorized operators | United Kingdom, SIDA, SACU | 22 February 2024 | Yes | Yes | Details |
| 8 - Border Agency Cooperation | World Bank, IFC | 30 April 2025 | Yes | Yes | Details |
| 10.4 - Single window | World Bank | 22 February 2025 | Yes | Yes | Details |
| 12 - Customs cooperation | United Kingdom, SIDA, WCO | 22 February 2027 | Yes | Yes | Details |
Fiji
| Implementation project | Donor / Agency | Definitive implementation dates | TA needs notified | Progress reported | |
|---|---|---|---|---|---|
| 1.1 - Publication | World Bank | 31 December 2020 | Yes | Yes | Details |
| 1.2 - Information available through internet | World Bank | 31 December 2020 | Yes | Yes | Details |
| 3 - Advance rulings | WCO | 31 December 2020 | Yes | Yes | Details |
| 4 - Procedures for appeal or review | World Bank, FAO | 31 December 2021 | Yes | Yes | Details |
| 5.3 - Test procedures | New Zealand, World Bank, PHAMA Plus | 31 December 2023 | Yes | Yes | Details |
| 7.4 - Risk management | World Bank | 31 December 2021 | Yes | Yes | Details |
| 7.6 - Average release times | World Bank, WCO | 31 December 2019 | Yes | Yes | Details |
| 7.7 - Authorized operators | Australia | 31 December 2021 | Yes | Yes | Details |
| 10.1 - Formalities | World Bank, GATF | 31 December 2019 | Yes | Yes | Details |
| 10.4 - Single window | World Bank, UNCTAD | 31 December 2025 | Yes | Yes | Details |
Ghana
| Implementation project | Donor / Agency | Definitive implementation dates | TA needs notified | Progress reported | |
|---|---|---|---|---|---|
| 1.1 - Publication | World Bank | 22 June 2022 | Yes | Yes | Details |
| 1.2 - Information available through internet | World Bank | 22 June 2022 | Yes | Yes | Details |
| 1.3 - Enquiry points | World Bank | 22 June 2022 | Yes | Yes | Details |
| 3 - Advance rulings | World Bank | 22 June 2022 | Yes | Yes | Details |
| 5.1 - Notifications for enhanced controls or inspections | World Bank | 22 December 2025 | Yes | Yes | Details |
| 5.3 - Test procedures | World Bank | 22 March 2024 | Yes | Yes | Details |
| 7.4 - Risk management | World Bank | 22 March 2025 | Yes | Yes | Details |
| 7.5 - Post-clearance audit | World Bank | 22 September 2023 | Yes | Yes | Details |
| 7.6 - Average release times | USAID | 22 March 2024 | Yes | Yes | Details |
| 7.7 - Authorized operators | USAID | 22 September 2024 | Yes | Yes | Details |
| 7.9 - Perishable goods | USAID | 22 March 2025 | Yes | Yes | Details |
Guatemala
| Implementation project | Donor / Agency | Definitive implementation dates | TA needs notified | Progress reported | |
|---|---|---|---|---|---|
| 1.1 - Publication | CLDP, USDOC | 01 February 2020 | Yes | Yes | Details |
| 1.2 - Information available through internet | European Union | 01 February 2020 | Yes | Yes | Details |
| 7.6 - Average release times | WCO | 01 July 2020 | Yes | Yes | Details |
| 10.4 - Single window | European Union, USAID | 01 January 2024 | Yes | Yes | Details |
Honduras
| Implementation project | Donor / Agency | Definitive implementation dates | TA needs notified | Progress reported | |
|---|---|---|---|---|---|
| 2.2 - Consultations | Germany, United Kingdom, UNCTAD, CLDP | 01 March 2024 | Yes | Yes | Details |
| 5.3 - Test procedures | Germany, United Kingdom, UNCTAD | 01 March 2025 | Yes | Yes | Details |
| 7.7 - Authorized operators | Germany, United Kingdom, UNCTAD, USAID | 01 March 2022 | Yes | Yes | Details |
| 10.4 - Single window | European Union, UNCTAD | 01 March 2027 | Yes | Yes | Details |
Kenya
| Implementation project | Donor / Agency | Definitive implementation dates | TA needs notified | Progress reported | |
|---|---|---|---|---|---|
| 1.2 - Information available through internet | GIZ, TMA, UNCTAD, ITC | 08 September 2023 | Yes | Yes | Details |
| 5.1 - Notifications for enhanced controls or inspections | European Union, TMA | 30 June 2026 | Yes | Yes | Details |
| 5.3 - Test procedures | European Union, TMA | 30 June 2033 | Yes | Yes | Details |
| 6.1 - General disciplines on fees and charges | TMA | 30 June 2033 | Yes | Yes | Details |
| 6.2 - Specific disciplines on fees and charges | TMA | 01 August 2025 | Yes | Yes | Details |
| 7.1 - Pre-arrival processing | GIZ | 30 June 2026 | Yes | Yes | Details |
| 7.4 - Risk management | GIZ | 30 June 2026 | Yes | Yes | Details |
| 7.5 - Post-clearance audit | WCO | 08 September 2023 | Yes | Yes | Details |
| 7.7 - Authorized operators | WCO, GIZ, Commonwealth Secretariat | 30 June 2026 | Yes | Yes | Details |
| 8 - Border Agency Cooperation | European Union, TMA, World Bank, AfDB, JICA | 08 September 2023 | Yes | Yes | Details |
| 10.1 - Formalities | TMA, GIZ | 30 June 2026 | Yes | Yes | Details |
| 10.3 - Use of international standards | European Union, TMA | 30 June 2026 | Yes | Yes | Details |
| 10.4 - Single window | TMA, GIZ | 08 September 2023 | Yes | Yes | Details |
| 11 - Transit | TMA | 30 June 2026 | Yes | Yes | Details |
Lao People's Democratic Republic
| Implementation project | Donor / Agency | Definitive implementation dates | TA needs notified | Progress reported | |
|---|---|---|---|---|---|
| 7.4 - Risk management | World Bank, JICA | 31 December 2025 | Yes | Yes | Details |
| 7.7 - Authorized operators | World Bank, JICA | 31 December 2025 | Yes | Yes | Details |
| 10.1 - Formalities | World Bank | 31 December 2025 | Yes | Yes | Details |
| 10.8 - Rejected Goods | ADB | 31 December 2025 | Yes | Yes | Details |
Lesotho
| Implementation project | Donor / Agency | Definitive implementation dates | TA needs notified | Progress reported | |
|---|---|---|---|---|---|
| 1.2 - Information available through internet | World Bank | 31 December 2028 | Yes | Yes | Details |
| 5.3 - Test procedures | IAEA, FAO | 31 December 2035 | Yes | Yes | Details |
| 7.1 - Pre-arrival processing | World Bank | 31 December 2027 | Yes | Yes | Details |
| 7.4 - Risk management | World Bank | 28 December 2028 | Yes | Yes | Details |
| 7.6 - Average release times | World Bank, UNCTAD | 31 December 2026 | Yes | Yes | Details |
| 7.7 - Authorized operators | SADC TRF, IMF, AFRITAC | 31 December 2028 | Yes | Yes | Details |
| 7.8 - Expedited shipments | WCO | 31 December 2028 | Yes | Yes | Details |
| 8 - Border Agency Cooperation | World Bank | 31 December 2035 | Yes | Yes | Details |
| 10.1 - Formalities | SADC TRF | 31 December 2025 | Yes | Yes | Details |
| 10.3 - Use of international standards | SADC TRF | 31 December 2028 | Yes | Yes | Details |
| 10.4 - Single window | World Bank | 31 December 2035 | Yes | Yes | Details |
| 10.7 - Common border procedures | World Bank | 31 December 2028 | Yes | Yes | Details |
| 12 - Customs cooperation | United Kingdom, SIDA | 31 December 2027 | Yes | Yes | Details |
Liberia
| Implementation project | Donor / Agency | Definitive implementation dates | TA needs notified | Progress reported | |
|---|---|---|---|---|---|
| 7.6 - Average release times | United Kingdom, WCO | 22 February 2022 | Yes | Yes | Details |
| 7.7 - Authorized operators | United Kingdom, WCO | 22 February 2025 | Yes | Yes | Details |
| 10.4 - Single window | World Bank, UNCTAD | 22 February 2025 | Yes | Yes | Details |
Madagascar
| Implementation project | Donor / Agency | Definitive implementation dates | TA needs notified | Progress reported | |
|---|---|---|---|---|---|
| 1.1 - Publication | AfDB | 30 April 2024 | Yes | Yes | Details |
| 1.2 - Information available through internet | AfDB | 30 April 2024 | Yes | Yes | Details |
| 3 - Advance rulings | GATF | 31 December 2022 | Yes | Yes | Details |
| 7.4 - Risk management | AfDB | 31 December 2035 | Yes | Yes | Details |
| 8 - Border Agency Cooperation | European Union, SADC TRF | 31 December 2035 | Yes | Yes | Details |
Mali
| Implementation project | Donor / Agency | Definitive implementation dates | TA needs notified | Progress reported | |
|---|---|---|---|---|---|
| 1.2 - Information available through internet | ITC, GIZ, DANIDA | 31 December 2027 | Yes | Yes | Details |
| 1.4 - Notification | World Bank, TFWA | 31 December 2025 | Yes | Yes | Details |
| 7.1 - Pre-arrival processing | UNCTAD, World Bank, TFWA | 31 December 2027 | Yes | Yes | Details |
| 7.4 - Risk management | World Bank, TFWA | 31 December 2026 | Yes | Yes | Details |
| 8 - Border Agency Cooperation | European Union, World Bank, WAEMU, TFWA | 31 December 2027 | Yes | Yes | Details |
| 10.3 - Use of international standards | World Bank, TFWA | 31 December 2028 | Yes | Yes | Details |
| 10.4 - Single window | AfDB | 31 December 2028 | Yes | Yes | Details |
Moldova, Republic of
| Implementation project | Donor / Agency | Definitive implementation dates | TA needs notified | Progress reported | |
|---|---|---|---|---|---|
| 1.2 - Information available through internet | USAID | 31 December 2025 | Yes | Yes | Details |
| 7.1 - Pre-arrival processing | European Union, EBRD, UNCTAD | 31 December 2025 | Yes | Yes | Details |
| 7.8 - Expedited shipments | European Union, EBRD, UNCTAD | 31 December 2025 | Yes | Yes | Details |
| 10.4 - Single window | European Union | 31 December 2025 | Yes | Yes | Details |
| 11 - Transit | European Union | 31 December 2025 | Yes | Yes | Details |
Nepal
| Implementation project | Donor / Agency | Definitive implementation dates | TA needs notified | Progress reported | |
|---|---|---|---|---|---|
| 7.4 - Risk management | ADB | 31 July 2028 | Yes | Yes | Details |
| 10.3 - Use of international standards | WCO | 31 December 2030 | Yes | Yes | Details |
| 10.4 - Single window | World Bank | 31 December 2026 | Yes | Yes | Details |
Niger
| Implementation project | Donor / Agency | Definitive implementation dates | TA needs notified | Progress reported | |
|---|---|---|---|---|---|
| 1.3 - Enquiry points | ITC, CILSS | 31 December 2028 | Yes | Yes | Details |
| 7.4 - Risk management | TFWA | 31 December 2027 | Yes | Yes | Details |
| 7.6 - Average release times | TFWA | 31 December 2026 | Yes | Yes | Details |
| 10.3 - Use of international standards | TFWA | 31 December 2039 | Yes | Yes | Details |
| 11 - Transit | TFWA | 31 December 2042 | Yes | Yes | Details |
| 12 - Customs cooperation | TFWA | 31 December 2029 | Yes | Yes | Details |
Paraguay
| Implementation project | Donor / Agency | Definitive implementation dates | TA needs notified | Progress reported | |
|---|---|---|---|---|---|
| 1.1 - Publication | ITC, UNCTAD, WTO, USDA | 01 September 2021 | Yes | Yes | Details |
| 1.2 - Information available through internet | ITC, UNCTAD, WTO, USDA | 01 September 2021 | Yes | Yes | Details |
| 1.3 - Enquiry points | USDA | 01 September 2021 | Yes | Yes | Details |
| 1.4 - Notification | USDA, ITC, UNCTAD, WTO | 01 September 2021 | Yes | Yes | Details |
| 2.1 - Comments and information before entry into force | UNCTAD, USDA, ALADI | 01 September 2020 | Yes | Yes | Details |
| 2.2 - Consultations | UNCTAD, USDA | 01 September 2020 | Yes | Yes | Details |
| 5.3 - Test procedures | European Union, World Bank, UNCTAD, USDA | 01 September 2023 | Yes | Yes | Details |
| 7.6 - Average release times | European Union, World Bank | 09 April 2021 | Yes | Yes | Details |
| 7.7 - Authorized operators | WCO, USAID, USDA, OEA | 01 September 2020 | Yes | Yes | Details |
| 7.8 - Expedited shipments | USDA | 01 September 2022 | Yes | Yes | Details |
| 8 - Border Agency Cooperation | USDA | 01 September 2027 | Yes | Yes | Details |
Peru
| Implementation project | Donor / Agency | Definitive implementation dates | TA needs notified | Progress reported | |
|---|---|---|---|---|---|
| 5.1 - Notifications for enhanced controls or inspections | World Bank, SECO, HELVETAS, Inter-American Institute for Cooperation on Agriculture | 30 June 2027 | Yes | Yes | Details |
| 5.3 - Test procedures | World Bank, SECO, HELVETAS | 30 June 2027 | Yes | Yes | Details |
Rwanda
| Implementation project | Donor / Agency | Definitive implementation dates | TA needs notified | Progress reported | |
|---|---|---|---|---|---|
| 1.3 - Enquiry points | USAID, UNCTAD, TMA | 31 August 2026 | Yes | Yes | Details |
| 5.3 - Test procedures | TMA, USAID, UNCTAD | 31 August 2026 | Yes | Yes | Details |
| 7.4 - Risk management | TMA | 31 August 2030 | Yes | Yes | Details |
| 7.6 - Average release times | ITC, UNCTAD | 31 August 2029 | Yes | Yes | Details |
| 8 - Border Agency Cooperation | European Union, World Bank, TMA | 31 August 2030 | Yes | Yes | Details |
| 10.6 - Use of customs brokers | USAID, UNCTAD | 31 August 2030 | Yes | Yes | Details |
Saint Lucia
| Implementation project | Donor / Agency | Definitive implementation dates | TA needs notified | Progress reported | |
|---|---|---|---|---|---|
| 3 - Advance rulings | World Bank | 30 June 2024 | Yes | Yes | Details |
| 5.1 - Notifications for enhanced controls or inspections | World Bank | 30 June 2027 | Yes | Yes | Details |
| 6.1 - General disciplines on fees and charges | World Bank | 31 December 2030 | Yes | Yes | Details |
| 6.2 - Specific disciplines on fees and charges | World Bank | 31 December 2030 | Yes | Yes | Details |
| 7.4 - Risk management | World Bank | 30 June 2024 | Yes | Yes | Details |
| 7.6 - Average release times | Investment Climate Reform Facility | 31 December 2023 | Yes | Yes | Details |
| 7.7 - Authorized operators | World Bank | 29 June 2028 | Yes | Yes | Details |
| 7.9 - Perishable goods | World Bank | 30 June 2027 | Yes | Yes | Details |
| 10.2 - Acceptance of copies | World Bank | 30 June 2024 | Yes | Yes | Details |
| 10.4 - Single window | World Bank, TFAF, Canada-CARICOM EDI | 30 June 2028 | Yes | Yes | Details |
Senegal
| Implementation project | Donor / Agency | Definitive implementation dates | TA needs notified | Progress reported | |
|---|---|---|---|---|---|
| 1.1 - Publication | USAID | 31 December 2028 | Yes | Yes | Details |
| 1.2 - Information available through internet | USAID | 31 December 2028 | Yes | Yes | Details |
| 1.3 - Enquiry points | USAID | 31 December 2028 | Yes | Yes | Details |
| 1.4 - Notification | USAID | 31 December 2028 | Yes | Yes | Details |
| 6.1 - General disciplines on fees and charges | USAID | 31 December 2030 | Yes | Yes | Details |
| 6.2 - Specific disciplines on fees and charges | USAID | 31 December 2030 | Yes | Yes | Details |
| 6.3 - Penalty Disciplines | USAID | 31 December 2035 | Yes | Yes | Details |
| 7.5 - Post-clearance audit | USAID | 31 December 2026 | Yes | Yes | Details |
| 7.7 - Authorized operators | USAID | 31 December 2024 | Yes | Yes | Details |
Seychelles
| Implementation project | Donor / Agency | Definitive implementation dates | TA needs notified | Progress reported | |
|---|---|---|---|---|---|
| 5.1 - Notifications for enhanced controls or inspections | European Union, FAO | 31 December 2025 | Yes | Yes | Details |
| 5.3 - Test procedures | European Union, SADC TRF | 31 December 2021 | Yes | Yes | Details |
| 7.4 - Risk management | SADC, WCO | 31 December 2021 | Yes | Yes | Details |
| 7.5 - Post-clearance audit | European Union, IMF | 31 December 2023 | Yes | Yes | Details |
| 7.6 - Average release times | WCO | 31 December 2021 | Yes | Yes | Details |
| 7.7 - Authorized operators | COMESA, IMF | 31 December 2023 | Yes | Yes | Details |
| 10.4 - Single window | European Union | 30 June 2027 | Yes | Yes | Details |
| 10.8 - Rejected Goods | European Union | 31 December 2021 | Yes | Yes | Details |
Sierra Leone
| Implementation project | Donor / Agency | Definitive implementation dates | TA needs notified | Progress reported | |
|---|---|---|---|---|---|
| 7.4 - Risk management | IMF | 31 December 2024 | Yes | Yes | Details |
| 7.5 - Post-clearance audit | IMF | 31 December 2024 | Yes | Yes | Details |
| 7.6 - Average release times | World Bank | 31 December 2023 | Yes | Yes | Details |
| 8 - Border Agency Cooperation | World Bank | 31 December 2025 | Yes | Yes | Details |
Solomon Islands
| Implementation project | Donor / Agency | Definitive implementation dates | TA needs notified | Progress reported | |
|---|---|---|---|---|---|
| 5.3 - Test procedures | FAO, EIF | 31 December 2040 | Yes | Yes | Details |
| 7.1 - Pre-arrival processing | Australia, UNCTAD | 31 December 2036 | Yes | Yes | Details |
| 7.4 - Risk management | Australia | 31 December 2036 | Yes | Yes | Details |
| 7.6 - Average release times | Australia | 31 December 2036 | Yes | Yes | Details |
| 10.3 - Use of international standards | FAO, EIF | 31 December 2040 | Yes | Yes | Details |
| 10.4 - Single window | World Bank | 31 December 2050 | Yes | Yes | Details |
Sri Lanka
| Implementation project | Donor / Agency | Definitive implementation dates | TA needs notified | Progress reported | |
|---|---|---|---|---|---|
| 1.3 - Enquiry points | World Bank | 30 June 2023 | Yes | Yes | Details |
| 3 - Advance rulings | ITC, ADB, TFAF | 31 December 2025 | Yes | Yes | Details |
| 5.1 - Notifications for enhanced controls or inspections | World Bank | 30 June 2023 | Yes | Yes | Details |
| 5.3 - Test procedures | World Bank | 10 October 2025 | Yes | Yes | Details |
| 6.1 - General disciplines on fees and charges | World Bank | 30 June 2024 | Yes | Yes | Details |
| 6.2 - Specific disciplines on fees and charges | World Bank | 30 June 2024 | Yes | Yes | Details |
| 7.4 - Risk management | World Bank | 10 October 2025 | Yes | Yes | Details |
| 7.5 - Post-clearance audit | ADB | 21 August 2024 | Yes | Yes | Details |
| 7.6 - Average release times | ADB | 15 December 2018 | Yes | Yes | Details |
| 7.7 - Authorized operators | USAID | 21 August 2024 | Yes | Yes | Details |
| 7.9 - Perishable goods | World Bank | 31 December 2024 | Yes | Yes | Details |
| 10.4 - Single window | World Bank, ADB, UNCTAD | 31 December 2030 | Yes | Yes | Details |
Tanzania
| Implementation project | Donor / Agency | Definitive implementation dates | TA needs notified | Progress reported | |
|---|---|---|---|---|---|
| 1.2 - Information available through internet | ITC, UNCTAD | 30 June 2030 | Yes | Yes | Details |
| 7.7 - Authorized operators | TMA, COMESA | 30 June 2030 | Yes | Yes | Details |
| 10.4 - Single window | AfDB | 30 December 2028 | Yes | Yes | Details |
Togo
| Implementation project | Donor / Agency | Definitive implementation dates | TA needs notified | Progress reported | |
|---|---|---|---|---|---|
| 1.2 - Information available through internet | Germany, GIZ | 31 December 2030 | Yes | Yes | Details |
| 7.4 - Risk management | World Bank, GATF | 31 December 2030 | Yes | Yes | Details |
| 7.6 - Average release times | World Bank | 31 December 2035 | Yes | Yes | Details |
| 8 - Border Agency Cooperation | World Bank | 31 December 2035 | Yes | Yes | Details |
| 11 - Transit | World Bank | 31 December 2038 | Yes | Yes | Details |
Tonga
| Implementation project | Donor / Agency | Definitive implementation dates | TA needs notified | Progress reported | |
|---|---|---|---|---|---|
| 1.2 - Information available through internet | Australia, New Zealand | 31 December 2029 | Yes | Yes | Details |
| 3 - Advance rulings | Australia, New Zealand | 31 December 2024 | Yes | Yes | Details |
| 7.4 - Risk management | Australia, New Zealand, WCO | 31 December 2024 | Yes | Yes | Details |
| 7.5 - Post-clearance audit | WCO | 31 December 2024 | Yes | Yes | Details |
| 7.6 - Average release times | WCO, World Bank | 31 December 2024 | Yes | Yes | Details |
| 7.7 - Authorized operators | World Bank | 31 December 2024 | Yes | Yes | Details |
| 8 - Border Agency Cooperation | WCO | 31 December 2024 | Yes | Yes | Details |
| 10.1 - Formalities | Australia, New Zealand | 31 December 2024 | Yes | Yes | Details |
| 10.3 - Use of international standards | WCO | 31 December 2024 | Yes | Yes | Details |
| 10.4 - Single window | Australia, New Zealand | 31 December 2029 | Yes | Yes | Details |
Trinidad and Tobago
| Implementation project | Donor / Agency | Definitive implementation dates | TA needs notified | Progress reported | |
|---|---|---|---|---|---|
| 1.3 - Enquiry points | CDB | 31 December 2023 | Yes | Yes | Details |
Tunisia
| Implementation project | Donor / Agency | Definitive implementation dates | TA needs notified | Progress reported | |
|---|---|---|---|---|---|
| 3 - Advance rulings | GATF, GIZ | 31 December 2030 | Yes | Yes | Details |
Uganda
| Implementation project | Donor / Agency | Definitive implementation dates | TA needs notified | Progress reported | |
|---|---|---|---|---|---|
| 1.2 - Information available through internet | TMA, UNCTAD, ITC, Swisscontact | 01 July 2024 | Yes | Yes | Details |
| 1.3 - Enquiry points | UNCTAD | 01 July 2025 | Yes | Yes | Details |
| 8 - Border Agency Cooperation | European Union, TMA, World Bank | 01 July 2026 | Yes | Yes | Details |
| 10.4 - Single window | TMA, UNCTAD | 01 July 2025 | Yes | Yes | Details |
Ukraine
| Implementation project | Donor / Agency | Definitive implementation dates | TA needs notified | Progress reported | |
|---|---|---|---|---|---|
| 3 - Advance rulings | CLDP | 31 December 2021 | Yes | Yes | Details |
| 3 - Advance rulings | CLDP | 31 December 2019 | Yes | Yes | Details |
| 3 - Advance rulings | CLDP | 30 June 2020 | Yes | Yes | Details |
| 3 - Advance rulings | CLDP | 31 December 2020 | Yes | Yes | Details |
| 7.3 - Separation of release | European Union | 31 December 2020 | Yes | Yes | Details |
| 7.4 - Risk management | European Union | 31 December 2021 | Yes | Yes | Details |
| 7.5 - Post-clearance audit | European Union | 31 December 2020 | Yes | Yes | Details |
| 10.4 - Single window | European Union | 31 December 2020 | Yes | Yes | Details |
| 11 - Transit | European Union | 31 December 2020 | Yes | Yes | Details |
Vanuatu
| Implementation project | Donor / Agency | Definitive implementation dates | TA needs notified | Progress reported | |
|---|---|---|---|---|---|
| 5.3 - Test procedures | World Bank | 31 December 2030 | Yes | Yes | Details |
| 7.4 - Risk management | World Bank | 31 December 2030 | Yes | Yes | Details |
| 7.6 - Average release times | World Bank, WCO | 31 December 2023 | Yes | Yes | Details |
| 7.7 - Authorized operators | Australia, World Bank | 31 December 2025 | Yes | Yes | Details |
| 10.3 - Use of international standards | World Bank | 31 December 2022 | Yes | Yes | Details |
| 10.4 - Single window | World Bank, UNCTAD | 31 December 2023 | Yes | Yes | Details |
No results found
48 members with 300 measures